Repair damaged insulation on chilled water lines near 785-6A.…
AM and DO is planning to apply crusher run at Old Excess Yard in N Area for additional D-level storage/refurbishments.…
This R and D activity will support the development of equipment and work control documents for the processing of Mark-18A targets.…
Two space heaters will be removed from the transfer bay and be disposed of.…
Overhaul of the compressed air system in L-Area due to age/reliability issues.…
Chemical addition components on the north wall of 780-2A are abandoned and no longer functional. Remove electrical feed to abandoned junction boxes…
717-11A Replace flooring.…
This project will develop an integrated transmission and distribution system planning tool and establish strategies to enhance the T and D infrastr…
The F Tank Farm facility requires the replacement of RADCON trailer 241-24F. The trailer is aged and needs to be replaced to enhance work related a…
Establish 12 new vadose zone lysimeter stations in E-Area around the perimeter of ET3, ET4, ST10, and ST14.…