The work scope involves the extraction of three (3) different asphalt core samples, taken at random location along Road G and three (3) different a…
Relocate and demolish trailers 706-19C and 706-21C.…
Installation of WI-FI in 735-4B.…
Install WIFI at 735-2B.…
703-5B Install WI-FI.…
Install new lighting to the collaboration room, room 213 at 730-2B.…
Relocate and demolish trailer 704-15B.…
Remove space savers in Room 1001A at 730-4B per Acknowledgement of Scope.…
703-47A Replace (4) doors.…
Provide Power to Buildings 706-H, 706-8H and 706-6H.…