Graphene oxide nanoribbons will be mixed in with cements, mortars, grouts and concretes to test their performance changes. Water-dispersed nanoribb…
Drill cylinder holes in doors to accept lock cylinder and install emergency exit device and trim. This work requires access to both sides of the do…
Correct broken portion of existing well access bridge for HPZ 003A well at H-Base Injection. Bridge is located in a soil contamination area.…
Confined Space Mock-up Trainer Modifications in Room 1056 of Building 766-H.…
Clean Out the Desiccant in Air Dryers at 285-H.…
Sliding Door Repair at 763-52N…
Install of Labconco ventless hood and Labconco storage cabinets.…
The HMI ("Signal" software running on Windows 7 PC) for the HVAC system at the 2H control room building is obsolete and unreliable. This HMI platfo…
Revision 4: Additional scope of approximately 930 LF of 6" diameter Fire Water line and 4 new Fire Hydrants, tied into existing Fire Water system. …
SREL is creating a new laboratory space in building 737-18A to be used for radiological research.…