The TEF Platform Mounted Robotic Arms (PMRA) are from 2003 and upgrade modifications are necessary for continued operation. The Proposed Activity i…
Upgrade Universal Wiring to CAT 5e in 731-1N.…
Replace submersible pump with two Gould 3171 ST vertical Sump Pumps Size: 1.5x3-6/5V.…
The Breathing Air filters that are in the H-Canyon Warm Gang Valve Corridor no longer have filter elements available commercially. The filter housi…
This EEC is part of the F/H Laboratory (FHL), 773-A Laboratory Modification Project. This activity covers the preparation of radioactive standards …
Remove and abate mastic tile floor and refinish concrete in 284-10F.…
Railroad Crossing Replacement at Road F and Main Line (Hillman Siding/Signal 07) and Road 6 and Main Line (Signal 11).…
Existing detection equipment in the L-Area Perimeter Intrusion Detection Assessment System (PIDAS) are to be removed and replaced with newer models…
Temporary Modification to provide an alternate power source to Motor Control Center (MCC) B907 from B202-2E during B9 outage.…
Mosquitos collected as larvae from SRS will be used on various behavior experiments. Research projects will focus on the looking at the behavior of…