Construction of Parking and Laydown Areas in the Vicinity of Pads 717-14F, 263-95F, and 249-F. CX(s) Applied: B1.15 Date: 01/20/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Advanced Fuel Cycle Initiative Americium/Curium Separations CX(s) Applied: B3.6 Date: 01/20/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
735-A Laboratory D137 Microscopy and Spectroscopy Research and Development CX(s) Applied: B3.6 Date: 01/20/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Replace 802-H Platform/Control Valve Ladder with New Lapeyre Stairs CX(s) Applied: B2.5 Date: 01/19/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Tank 50 Formulation Treatability Study CX(s) Applied: B3.6 Date: 01/19/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Actinide Removal Process/Modular Caustic Side Solvent Extraction Unit Salt Batch Qualification CX(s) Applied: B3.6 Date: 01/19/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Heat Exchanger Removal and Disposition CX(s) Applied: B1.23 Date: 01/18/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Fire Suppression System Modifications, 772-1F CX(s) Applied: B2.5 Date: 01/18/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Modify Tank Return Header to Provide Hose Connection CX(s) Applied: B1.3 Date: 01/18/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Demolition of Building 250-2S CX(s) Applied: B1.23 Date: 01/18/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office