Replace Trailer Space Roll Door North Side Purification CX(s) Applied: B1.3 Date: 01/18/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Dynamic Mechanical Testing with Battery Electrolyte in Savannah River National Laboratory Designed Sample Holders CX(s) Applied: B3.6 Date: 01/18/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Scaled Saltstone Mixer Commissioning CX(s) Applied: B3.6 Date: 01/18/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Copper Catalyzed peroxide Destruction of Tank 48H Tetraphenylborate Wastes CX(s) Applied: B3.6 Date: 01/17/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Construction of 37 Parking Spaces South of 251-4F CX(s) Applied: B1.15 Date: 01/17/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Parking Lot Construction North of Pad 717-14F CX(s) Applied: B1.15 Date: 01/17/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Insulation removal work in F-Tank Farm CX(s) Applied: B1.3 Date: 01/04/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Nonproliferation Technology Section - Nanomaterials Research CX(s) Applied: B3.6 Date: 01/04/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Control Room Consolidation CX(s) Applied: B2.2 Date: 12/29/2011 Location(s): South Carolina Offices(s): Savannah River Operations Office
703-5B Air Operations Division Generator Replacement CX(s) Applied: B2.5 Date: 12/29/2011 Location(s): South Carolina Offices(s): Savannah River Operations Office