906-T Air Stripper Dismantle and Removal CX(s) Applied: B1.23 Date: 07/18/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
792-A Sidewalk Installation CX(s) Applied: B1.13 Date: 07/18/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Component Development and Testing for Electrolytic Cells CX(s) Applied: B3.6 Date: 07/16/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Development for Hydrogen Storage and Neutron Conversion Materials, Lab 152 CX(s) Applied: B3.6 Date: 07/16/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Demolition of the 745-N Excess Equipment Pad CX(s) Applied: B1.23 Date: 07/16/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Replace 735-A South Header Ductwork Located on D-wing Service Floor CX(s) Applied: B2.3 Date: 07/16/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Repair Roof at 192-2K CX(s) Applied: B1.3 Date: 07/11/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Extraction of Uranium Compounds from Environmental Samples CX(s) Applied: B3.6 Date: 07/03/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Radionuclide Release from Tank Waste Residual Solids CX(s) Applied: B3.6 Date: 07/03/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Thermal Diffusivity Evaluation CX(s) Applied: B3.6 Date: 07/02/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office