Place Old A-Cell Block Crane in Sealand Container for Disposal CX(s) Applied: B1.3 Date: 07/31/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Raman and Absorption Spectroscopy CX(s) Applied: B3.6 Date: 07/31/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Raman and Absorption Spectroscopy CX(s) Applied: B3.6 Date: 07/31/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Temporary Modification (ETP-TMC-13-01) to Install an Ultrasonic Sound Emitting Device to Control Algae in the H-Retention Basin CX(s) Applied: B3.6 Date: 07/31/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Subcontractor Repair of Leak Over Entry Door #1 at 703-B CX(s) Applied: B1.3 Date: 07/31/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Install Stud, Shims, and Nut in the L-Basin 70-Ton Cask Lid Support Structure CX(s) Applied: B2.5 Date: 07/30/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Install Well Pump into the F-Tank Farm Catch Tank FL-241901-WTS-TK-1 CX(s) Applied: B1.3 Date: 07/23/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Temporary Removal of the Tank 12 Purge Exhaust Reheater via HTF-TMC-13-028 CX(s) Applied: B1.3 Date: 07/23/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
300 square feet of Modified Bitumen Roof Repair CX(s) Applied: B1.3 Date: 07/23/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Characterization of Methanotrophs at the Old Integrated Demonstration Site, M Area CX(s) Applied: B3.1 Date: 07/23/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office