The 115 kV transformers, both switchgears A and B, associated 4160V secondary cables, protective relaying, breakers, and control wiring, 480V trans…
Remove insulation on caustic line to identify and repair caustic leak.…
This proposed activity is to remove two aging process air compressors located inside Section 18 of H Canyon and replace them with two new water-coo…
Relocate Mass Spectrometer system in Room 109 Building 264-H to Building 233-H Room 10.…
Replace 218-1H Overhead Door with Roll-Up Door.…
This tile will be picked up for disposal and the remaining piece of tile that is still attached to the floor will be removed and new tile will be p…
This work is part of a statewide initiative to increase gopher frog populations and potentially help the species avoid federal listing in 2025.…
Install AC Current Monitoring on select Saltstone Facility equipment.…
The Proposed Activity provides permanent power to the HVAC unit.…
This modification will replace the existing 234-H FACP with the manufacturer’s suggested replacement panel that will provide compatibility with all…