Columbia Rural Electric Association Walla Walla Hydroelectric Project CX(s) Applied: B4.1 Date: 12/21/2012 Location(s): Washington Offices(s): Bonneville Power Administration
Improve the Access Road System in Miles 4, 5, 16, 17, 18, and 30 of the Lower Granite-Hatwai Transmission Line CX(s) Applied: B1.3, B1.13 Date: 12/19/2012 Location(s): Washington, Idaho Offices(s): Bonneville Power Administration
Pasco Land Acquisition CX(s) Applied: B1.24 Date: 12/17/2012 Location(s): Washington Offices(s): Bonneville Power Administration
Lane Substation 500/230-kV Transformer Phase Separation Project CX(s) Applied: B4.6 Date: 12/06/2012 Location(s): Oregon Offices(s): Bonneville Power Administration
Alcoa Power Sales Contract CX(s) Applied: B4.1 Date: 12/04/2012 Location(s): Oregon, Washington Offices(s): Bonneville Power Administration
Keeler Substation-Control House Expansion CX(s) Applied: B4.11 Date: 12/04/2012 Location(s): Oregon Offices(s): Bonneville Power Administration
FY13 Environmental Drainage Upgrades at Bonneville Power Administration’s Clatsop, Garrison, Lexington, Mapleton, Ovando, Pearl, and Wren Substations CX(s) Applied: B4.6 Date: 12/03/2012 Location(s): Oregon, Montana, Washington, Oregon, Oregon Offic...
Spring Creek – Wine County No. 1 Transmission Tower Relocation CX(s) Applied: B4.6 Date: 11/29/2012 Location(s): Oregon Offices(s): Bonneville Power Administration
Wood Pole Replacements Along the Drummond-Macks Inn, Macks Inn-Madison, and Swan Valley-Teton 115-kilovolt Transmission Line Rights-of-Way CX(s) Applied: B1.3 Date: 11/29/2012 Location(s): Idaho, Idaho Offices(s): Bonneville Power Administration
Snohomish Substation Control House Expansion & Seismic Retrofit CX(s) Applied: B4.11 Date: 11/08/2012 Location(s): Washington Offices(s): Bonneville Power Administration