Install Rip Rap Along Stream Bank at Two Wood Pole Structures Located Along the Bell-Boundary No. 3 Transmission Line CX(s) Applied: B1.3 Date: 03/25/2013 Location(s): Washington Offices(s): Bonneville Power Administration
Revenue Meter Replacement at Franklin County Public Utility District’s (PUD) Taylor Flats Substation CX(s) Applied: B1.7 Date: 03/25/2013 Location(s): Washington Offices(s): Bonneville Power Administration
Wenatchee District Wood Pole Replacements CX(s) Applied: B1.3 Date: 03/22/2013 Location(s): Washington, Washington Offices(s): Bonneville Power Administration
Install High Frequency Antennas at Bonneville Power Administration Maintenance Headquarters CX(s) Applied: B1.19 Date: 03/21/2013 Location(s): Oregon, Washington, Washington Offices(s): Bonneville Power Administration
Libby-Troy Access Road Upgrades CX(s) Applied: B1.3 Date: 03/20/2013 Location(s): Montana Offices(s): Bonneville Power Administration
Buckley-Marion Overhead Groundwire Replacement Project CX(s) Applied: B1.3 Date: 03/20/2013 Location(s): Oregon, Oregon Offices(s): Bonneville Power Administration
Sundial Island Transmission Tower Relocation CX(s) Applied: B4.6 Date: 03/20/2013 Location(s): Oregon Offices(s): Bonneville Power Administration
Revenue Meter Replacement at Benton County Public Utility District’s (PUD) Finley Substation CX(s) Applied: B1.7 Date: 03/13/2013 Location(s): Washington Offices(s): Bonneville Power Administration
Revenue Meter Replacement at Oregon Trail Electric Co-op’s (OTEC's) West John Day Substation CX(s) Applied: B1.7 Date: 03/13/2013 Location(s): Oregon Offices(s): Bonneville Power Administration
2013 Spacer and Insulator Replacement Program: First and Second Quarter Projects CX(s) Applied: B1.3 Date: 03/11/2013 Location(s): Oregon, Oregon, Washington, Montana, Montana Offices(s): Bonneville Power Administration