Pearl-Marion No.1 Line Tower 21/1 Bank Repair Project CX(s) Applied: B1.3 Date: 08/13/2012 Location(s): Oregon Offices(s): Bonneville Power Administration
AT&T Fiber Addition North Bonneville-Ross No. 2 CX(s) Applied: B4.7 Date: 08/09/2012 Location(s): Washington Offices(s): Bonneville Power Administration
Sno-King Substation Expansion CX(s) Applied: B4.11 Date: 08/08/2012 Location(s): Washington Offices(s): Bonneville Power Administration
Disposition of Mountain Avenue Tap Line Sectionalizing Switches CX(s) Applied: B1.24 Date: 08/08/2012 Location(s): Oregon Offices(s): Bonneville Power Administration
Celilo Converter Station Curtain Wall Replacement CX(s) Applied: B1.3 Date: 08/08/2012 Location(s): Oregon Offices(s): Bonneville Power Administration
D Analog Communications Retirement at Del Rio, Chief Joseph, and Foster Creek CX(s) Applied: B1.19 Date: 08/06/2012 Location(s): Washington Offices(s): Bonneville Power Administration
Wautoma-Ostrander Surface Impairment Removal CX(s) Applied: B1.3 Date: 08/01/2012 Location(s): Washington Offices(s): Bonneville Power Administration
North Bonneville-Midway No. 1 Tower 75/4 Replacement CX(s) Applied: B1.3 Date: 08/01/2012 Location(s): Washington Offices(s): Bonneville Power Administration
Pilot Butte-La Pine No. 1 Wood Pole Replacement Project CX(s) Applied: B4.6 Date: 07/30/2012 Location(s): Oregon Offices(s): Bonneville Power Administration
Bonneville Power Administration/Washington Department of Natural Resources Access Road Improvements CX(s) Applied: B1.3 Date: 07/30/2012 Location(s): Washington, Washington, Washington, Washington Offices(s): Bonneville Power Administration