Integration of the Port of Tillamook Bay Generating Facility CX(s) Applied: B1.7 Date: 04/15/2013 Location(s): Oregon Offices(s): Bonneville Power Administration
Electronic Equipment Upgrades and Emergency Generator Replacements CX(s) Applied: B1.7 Date: 04/12/2013 Location(s): CX: none Offices(s): Bonneville Power Administration
Brasada-Harney No. 1 Wood Pole Replacement Project CX(s) Applied: B1.3 Date: 04/12/2013 Location(s): Oregon, Oregon Offices(s): Bonneville Power Administration
Chinook Property Funding - Update CX(s) Applied: B1.25 Date: 04/09/2013 Location(s): Washington Offices(s): Bonneville Power Administration
Digital Communication System Upgrade Project: ‘D’ Analog System Retirement and #WC SONET Ring CX(s) Applied: B1.19 Date: 04/05/2013 Location(s): Washington Offices(s): Bonneville Power Administration
Augspurger Radio Tower Replacement Project CX(s) Applied: B1.19 Date: 04/03/2013 Location(s): Washington Offices(s): Bonneville Power Administration
Chinook Property Funding CX(s) Applied: B1.25 Date: 04/01/2013 Location(s): Washington Offices(s): Bonneville Power Administration
Fairmount Substation Equipment Acquisition CX(s) Applied: B1.24 Date: 03/27/2013 Location(s): Washington Offices(s): Bonneville Power Administration
Install Rip Rap Along Stream Bank at Two Wood Pole Structures Located Along the Bell-Boundary No. 3 Transmission Line CX(s) Applied: B1.3 Date: 03/25/2013 Location(s): Washington Offices(s): Bonneville Power Administration
Revenue Meter Replacement at Franklin County Public Utility District’s (PUD) Taylor Flats Substation CX(s) Applied: B1.7 Date: 03/25/2013 Location(s): Washington Offices(s): Bonneville Power Administration