LaPine Substation Shunt Reactor Addition CX(s) Applied: B4.6 Date: 06/03/2013 Location(s): Oregon, Oregon Offices(s): Bonneville Power Administration
Rocky Ridge Radio Station Upgrade CX(s) Applied: B1.19 Date: 05/31/2013 Location(s): Montana Offices(s): Bonneville Power Administration
Routine Maintenance on the Colville-Republic Number 1 Transmission Line CX(s) Applied: B1.3 Date: 05/30/2013 Location(s): Washington, Washington Offices(s): Bonneville Power Administration
Chenoweth-Goldendale Number 1 Disconnect Switch Project CX(s) Applied: B4.6 Date: 05/30/2013 Location(s): Washington Offices(s): Bonneville Power Administration
Garrison Substation Access Roads CX(s) Applied: B1.3, B1.13 Date: 05/28/2013 Location(s): Montana Offices(s): Bonneville Power Administration
Eugene Substation Fiber Interconnection CX(s) Applied: B4.7 Date: 05/21/2013 Location(s): Oregon Offices(s): Bonneville Power Administration
Flight's End Property Funding CX(s) Applied: B1.25 Date: 05/20/2013 Location(s): Oregon Offices(s): Bonneville Power Administration
Chandler Tap Line Reconductoring CX(s) Applied: B4.6 Date: 05/17/2013 Location(s): Washington Offices(s): Bonneville Power Administration
Badger Canyon-Richland #1 Wood Poles CX(s) Applied: B1.3 Date: 05/17/2013 Location(s): Washington Offices(s): Bonneville Power Administration
Luckiamute Meadows Property Funding CX(s) Applied: B1.25 Date: 05/15/2013 Location(s): Oregon Offices(s): Bonneville Power Administration