Paisley Geothermal Integration CX(s) Applied: B1.7 Date: 08/09/2013 Location(s): Oregon Offices(s): Bonneville Power Administration
Chief Joseph-Snohomish Rockfall Barrier Fence Construction CX(s) Applied: B1.11 Date: 08/05/2013 Location(s): Washington Offices(s): Bonneville Power Administration
Port of Morrow Land Acquisition CX(s) Applied: B1.24 Date: 07/31/2013 Location(s): Oregon Offices(s): Bonneville Power Administration
2013 Spokane District Wood pole Replacement Projects CX(s) Applied: B1.3 Date: 07/31/2013 Location(s): Washington, Washington, Washington, Washington, Idaho Offices(s): Bonneville Power Administration
Upper Jocko River Property Funding CX(s) Applied: B1.25 Date: 07/16/2013 Location(s): Montana Offices(s): Bonneville Power Administration
Peninsula Light Company Line and Load Interconnection Request L0308 (Amendment) CX(s) Applied: B4.12 Date: 07/25/2013 Location(s): Washington Offices(s): Bonneville Power Administration
Celilo Converter Station Upgrades CX(s) Applied: B4.11 Date: 07/25/2013 Location(s): Oregon Offices(s): Bonneville Power Administration
McLoughlin Substation Metering Panel Ownership Transfer CX(s) Applied: B1.24 Date: 07/23/2013 Location(s): Oregon Offices(s): Bonneville Power Administration
Capacity Increase on Bonneville Power Administration's (BPA) Horse Ranch Tap Line CX(s) Applied: B4.6 Date: 07/17/2013 Location(s): Washington Offices(s): Bonneville Power Administration
McNary Substation Shunt Capacitor Addition CX(s) Applied: B4.6 Date: 07/17/2013 Location(s): Oregon Offices(s): Bonneville Power Administration