CX-013305: Categorical Exclusion Determination

Replace Buckling Tower 1/9 on the Raymond-Henkle Street Number 1 Line CX(s) Applied: B4.13Date: 01/06/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration

Office of NEPA Policy and Compliance

January 6, 2015
Estimated Read Time   min

Replace Buckling Tower 1/9 on the Raymond-Henkle Street Number 1 Line
CX(s) Applied: B4.13
Date: 01/06/2015
Location(s): Washington
Offices(s): Bonneville Power Administration

The Bonneville Power Administration (BPA) proposes to replace a buckling lattice transmission tower with a wood pole H structure. An auger will be used to remove any loose soil from the existing hole prior to new wood pole placement.