Palisades-Swan Valley Transmission Line Rebuild CX(s) Applied: B4.13 Date: 06/30/2014 Location(s): Idaho Offices(s): Bonneville Power Administration
Office of NEPA Policy and Compliance
June 30, 2014Palisades-Swan Valley Transmission Line Rebuild
CX(s) Applied: B4.13
Date: 06/30/2014
Location(s): Idaho
Offices(s): Bonneville Power Administration
Bonneville Power Administration (BPA) proposes to rebuild the existing Palisades-Swan Valley 115-kilovolt (kV) transmission line.
CX(s) Applied: B4.13
Date: 06/30/2014
Location(s): Idaho
Offices(s): Bonneville Power Administration
Bonneville Power Administration (BPA) proposes to rebuild the existing Palisades-Swan Valley 115-kilovolt (kV) transmission line.