Ross Communication Tower Fiber Installation CX(s) Applied: B4.7 Date: 01/15/2014 Location(s): Washington Offices(s): Bonneville Power Administration
Lightspeed Network's Fiber Installation near Pilot Butte Substation CX(s) Applied: B4.7 Date: 01/15/2014 Location(s): Oregon Offices(s): Bonneville Power Administration
Longview-Cowlitz Fiber Optic Cable Upgrade CX(s) Applied: B4.7 Date: 01/06/2014 Location(s): Washington Offices(s): Bonneville Power Administration
Happy Jack 230 Kilovolt Substation Fiber Optic Installation in Laramie County, Wyoming CX(s) Applied: B4.7 Date: 12/31/2013 Location(s): Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region
Fiber Upgrades at Bonneville Power Administration (BPA) Teton Wireless Communication Site CX(s) Applied: B4.7 Date: 11/05/2013 Location(s): Wyoming Offices(s): Bonneville Power Administration
Construction and Maintenance Activities at Existing Field Offices and Operation Centers CX(s) Applied: B1.3, B1.4, B1.11, B1.16, B1.17, B1.27, B1.31, B1.33, B1.34, B2.2, B2.3, B2.5, B4.7, B5.1, B5.16, B5.17, B5.23 Date: 10/17/2013 Location(s): CX: non...
Dixon Substation Fiber Optic Cable Installation CX(s) Applied: B4.7 Date: 09/24/2013 Location(s): Montana Offices(s): Bonneville Power Administration
Bell-Boundary Fiber Project CX(s) Applied: B4.7 Date: 09/13/2013 Location(s): Washington, Washington Offices(s): Bonneville Power Administration
Liberty-Parker Dam #2 230-Kilovolt Transmission Line, Optical Power Ground Wire Repair CX(s) Applied: B4.7 Date: 08/22/2013 Location(s): Arizona Offices(s): Western Area Power Administration-Desert Southwest Region
Archer-Stegall 230-Kilovolt Fiber Optic Ground Wire Addition CX(s) Applied: B4.7 Date: 08/20/2013 Location(s): Nebraska, Nebraska Offices(s): Western Area Power Administration-Rocky Mountain Region