Categorical Exclusion Determination
Categorical Exclusion Determination
Categorical Exclusion Determination
Categorical Exclusion Determination
Teton to Targhee Fiber Communication Project CX(s) Applied: B4.7Date: 09/13/2016 Location(s): Multiple LocationsOffices(s): Bonneville Power Administration
Lane Substation Fiber Separation CX(s) Applied: B4.7Date: 08/23/2016 Location(s): OregonOffices(s): Bonneville Power Administration
Troutdale Substation Fiber Installation CX(s) Applied: B4.7Date: 08/17/2016 Location(s): OregonOffices(s): Bonneville Power Administration
Ault - Weld West 230-kilovolt, Cheyenne - Snowy Range 230 kilovolt, and Erie - Terry Street 115 kilovolt Transmission Line Fiber Optic Ground Wire Installation, Broomfield and Weld Counties, Colorado and Laramie County, Wyoming CX(s) Applied: B4.7Date:...
Fiber Optic Cable Installation at Maupin Substation CX(s) Applied: B4.7Date: 08/01/2016 Location(s): OregonOffices(s): Bonneville Power Administration
Bald Mountain - Taft Substation Fiber Optic Cable Installation (Update) CX(s) Applied: B4.7Date: 42570 Location(s): MontanaOffices(s): Bonneville Power Administration