Bonneville Power Administration (BPA) proposes to upgrade, replace, and install new electrical station service and fiber optic cable networks acros…
Construct up to 3 nested microgrids, with up to 1.4 MW / 2.54 MWh of energy storage, up to 0.75 linear miles of 12kV conduit and wire, up to 4 line…
Bonneville Power Administration (BPA) proposes to allow Franklin Public Utility District (FPUD) to install a new vault and fiber optic cable on BPA…
Bonneville Power Administration (BPA) proposes to allow Tillamook Public Utility District (TPUD) to interconnect its new Oceanside 115 kV transmiss…
Bonneville Power Administration (BPA) proposes to construct the new 500/230-kilovolt (kV) Sixmile Canyon Substation. Sixmile Canyon Substation woul…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR) proposes to approve an interconnection Delivery Point (DP) request from Tri-S…
Bonneville Power Administration (BPA) proposes to install electronic equipment and fiber optic cable to facilitate the interconnection of One Energ…
Southwestern Power Administration proposes to rebuild 12.1 miles of 161kV transmission line from Liberty Substation near Liberty, Oklahoma to the V…
Western Area Power Administration, Sierra Nevada Region (WAPA) markets and transmits power to several wholesale customers in California. WAPA propo…
BPA proposes to allow Okanogan County Electric Cooperative (the "Co-op") to trench and install a fiber optic cable at BPA's Winthrop Substation in …