Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to replace distribution structures and install all-dielectric self-…
Bonneville Power Administration (BPA) proposes to construct a new 500/230-kilovolt (kV) Longhorn Substation, which would also require some modifica…
The U.S. Department of Energy (DOE) Pacific Northwest Site Office (PNSO) proposes to conduct minor alteration, repair, replacement, or relocation o…
The U.S. Department of Energy (DOE) Pacific Northwest Site Office (PNSO) proposes to conduct minor alteration, repair, replacement, or relocation o…
To facilitate the new lighting, eleven new poles would be required with fiber optic cable and access to an air compressor for support.…
Bonneville Power Administration (BPA) proposes to upgrade, replace, and install new electrical station service and fiber optic cable networks acros…
Hanford Mission Integration Solutions (HMIS) and their subcontractors perform adding of fiber optic cables to transmission facilities or burying fi…
Rebuild 12.1 miles of 161kV transmission line 3005 from Liberty Substation to Van Buren Substation.…
The new rebuild will consist of conductor, OPGW, and overhead ground wire with associated hardware and rebuild.…
The project has decided that the use of pole-mounted fiber is better suited for the area.…