Dominion Energy is installing fiber optic cables on top of 115 kV structures from 151-1K (Station 14) to 151-2C (Station 15-2).…
Upgrading the SRS technological infrastructure by installing underground fiber optic cable at various locations across the site.…
INL proposes to purchase telecommunication transport infrastructure operation and management activities from a service subcontractor (i.e., Syringa…
The purpose of this revision is to address snow removal, specifically using a grader (patrol), on the road that connects the Obsidian Test Pad to t…
The Mission Support Contractor (MSC) and its subcontractors perform adding of fiber optic cables to transmission facilities or burying fiber optic …
The Life Safety System (LSS) for the Specific Manufacturing Capability (SMC) and Test Area North (TAN) is over 20 years old, and replacement parts …
Western Area Power Administration (WAPA), Rocky MountainRegion (RMR), proposes to install a fiber optic cable at the Black Hollow (BH) MeteringStat…
Bonneville Power Administration (BPA) proposes to allow PacificCorp to install underground fiber into BPA’s Megler Radio Station. Trenching for fib…
Western Area Power Administration (WAPA), Rocky Mountain Region, proposes to install approximately 4.5 miles of optical ground wire (OPGW), and per…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to install new optical ground wire (OPGW) on WAPA’s existing Sterli…