Installation of new fiber-optic cable from the WAPA Watertown Static VAR to Basin's Watertown Repeater Building located on WAPA land.…
The project will integrate ADMS/AEMS to command and control the electric distribution/transmission systems, update the GIS system to create a digit…
Install 200,000 edge computing sensors, Install 22,500 2-way load control switches/sensors, Install 100 miles of fiber optic cable, education and …
Installation of a 3 MW, 12 MWH battery energy storage system (BESS), pole replacement, FLISR device installation, and fiber-ethernet switch install…
Installation of underground conduit and fiber-optic cable from the WAPA Forman control building to a vault installed by Ottertail Power on WAPA pro…
Extension of underground work originally submitted in 2018 for 30/5 to 30/6 to be expanded all the way to 30/3. Project includes installation of un…
To facilitate the new lighting, eleven new poles would be required with fiber optic cable and access to an air compressor for support.…
Bonneville Power Administration (BPA) proposes to construct two landings on existing access roads to rebuild the top half of structure 22/2 on the …
The U. S. Department of Energy (DOE), Richland Operations Office (RL), Infrastructure and Services Division (ISD) proposes to modify the 13.SkV ele…
Bonneville Power Administration (BPA) proposes to temporarily remove the 15 kilovolt (kV) station service cable located beneath Ridder Road between…