The National Park Service proposes to reconstruct or replace existing utilities (electrical, water, gas, and communication) in new right-of-way (ROW) along State Road 4 in Technical Area (TA) 39 at Los Alamos National Laboratory (LANL).
Office of NEPA Policy and Compliance
July 18, 2025The National Park Service proposes to reconstruct or replace existing utilities (electrical, water, gas, and communication) in new right-of-way (ROW) along State Road 4 in Technical Area (TA) 39 at Los Alamos National Laboratory (LANL). The existing utilities will be reconstructed or replaced in kind. The soil in the ROW is previously disturbed and will be stabilized upon completion of the utility replacement project. No soil disturbance in undeveloped areas is needed for the project.