CX-033490: 2025 Helicopter Landing Zone for Keswick Olinda Fiber Replacement Project Phase 1

WAPA proposes to replace 17 miles of existing overhead static line with OPGW (optical ground wire) on three 230 kilovolt transmission lines (Keswic…

Office of NEPA Policy and Compliance

December 11, 2024
minute read time

WAPA proposes to replace 17 miles of existing overhead static line with OPGW (optical ground wire) on three 230 kilovolt transmission lines (Keswick-Olinda, Keswick-O'Banion, and Shasta-Cottonwood) coming from the Keswick substation to Olinda substation.