Silver Butte Fiber Burial Project CX(s) Applied: B.47 Date: 08/28/2012 Location(s): Montana, Montana Offices(s): Bonneville Power Administration
AT&T Fiber Addition North Bonneville-Ross No. 2 CX(s) Applied: B4.7 Date: 08/09/2012 Location(s): Washington Offices(s): Bonneville Power Administration
South Tacoma-Frederickson Fiber Project (Update) CX(s) Applied: B4.7 Date: 07/13/2012 Location(s): Washington Offices(s): Bonneville Power Administration
Lancaster Line and Load Project CX(s) Applied: B4.6, B4.7 Date: 06/28/2012 Location(s): Idaho Offices(s): Bonneville Power Administration
Fiber Optic Installation at the Stegall 230 Kilovolt Substation Scotts Bluff County, Nebraska CX(s) Applied: B4.7 Date: 06/20/2012 Location(s): Nebraska Offices(s): Western Area Power Administration-Rocky Mountain Region
Utility Corridor Extension CX(s) Applied: B4.7, B4.11, B5.2, B5.5 Date: 06/13/2012 Location(s): Pennsylvania Offices(s): Naval Nuclear Propulsion Program, Bettis Site
Categorical Exclusion Determination
Infrastructure Demolition, Replacement, and Related Activities at the Weldon Spring, Missouri, Site CX(s) Applied: B1.3, B1.7, B1.15, B1.23, B1.24, B1.26, B1.36, B3.1, B4.7 Date: 05/31/2012 Location(s): Missouri Offices(s): Legacy Management
Minor Road and Utility Operations CX(s) Applied: B1.3, B1.7, B1.13, B1.32, B4.7 Date: 11/28/2011 Location(s): Washington Offices(s): Science, Pacific Northwest Site Office
Maxwell - O'Banion Optical Ground WireCX(s) Applied: B1.7, B4.6, B4.7, B4.11Date: 09/15/2011Location(s): Sutter County, CaliforniaOffice(s): Western Area Power Administration-Sierra Nevada Region, National Energy Technology Laboratory