Western Area Power Administration proposes to replace and bury Optical Ground Wire along the Blue Mesa - Skito 115-kilovolt Transmission Line, located in Gunnison County, Colorado. The proposed project is needed to replace a section of damaged Optical Ground Wire located along the Blue Mesa - Skito 115-kilovolt Transmission Line right-of-way, CX: Between Structure 22/1 and Structure 22/4.