Bucknam Temporary Tap, Natrona County, Wyoming CX(s) Applied: B4.6 Date: 12/15/2011 Location(s): Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region
Associated Electric Cooperative, Inc. Substation Improvements CX(s) Applied: B4.6 Date: 12/05/2011 Location(s): Missouri Offices(s): Southwestern Power Administration
Longview Sectionalizing Breaker Upgrades CX(s) Applied: B1.11, B4.6 Date: 11/28/2011 Location(s): Washington Offices(s): Bonneville Power Administration
Inland Power & Light 230-kilovolt Substation Project CX(s) Applied: B4.6 Date: 11/17/2011 Location(s): Washington Offices(s): Bonneville Power Administration
Blythe-Knob Guy Wire Anchor Replacement CX(s) Applied: B4.6 Date: 11/14/2011 Location(s): California Offices(s): Western Area Power Administration-Desert Southwest Region
Griffith Substation Transformer Addition CX(s) Applied: B4.6 Date: 11/14/2011 Location(s): Nevada Offices(s): Western Area Power Administration-Desert Southwest Region
Idalia to Asherville Transmission Line Reconductoring Project CX(s) Applied: B4.6 Date: 10/13/2011 Location(s): Missouri Offices(s): Southwestern Power Administration
Transformer Replacement and Foundation Work at Flaming Gorge Substation Daggett County, Utah CX(s) Applied: B4.6 Date: 10/05/2011 Location(s): Utah Offices(s): Western Area Power Administration-Rocky Mountain Region
Line and Load Interconnection of Coos-Curry Electric Cooperative?s New Substation to Bonneville Power Administration?s Fairview-Bandon 115-Kilovolt Transmission LineCX(s) Applied: B4.6, B4.10Date: 09/26/2011Location(s): Coos County, OregonOffice(s): Bo...
Plant Transformer Purchase - Installation of a Low Flow Unit at the Abiquiu Hydroelectric PlantCX(s) Applied: B4.6Date: 09/20/2011Location(s): County of Los Alamos, New MexicoOffice(s): Energy Efficiency and Renewable Energy, Sandia Site Office