Upgrade of the Existing Septic System at the Redmond Substation and Maintenance Facility CX(s) Applied: B4.6 Date: 02/08/2012 Location(s): Oregon Offices(s): Bonneville Power Administration
Upgrade of the Existing Septic System at the Big Eddy Substation and Maintenance Facility CX(s) Applied: B4.6 Date: 02/07/2012 Location(s): Oregon Offices(s): Bonneville Power Administration
Yellowtail Dam Tie Lines CX(s) Applied: B2.5, B4.6 Date: 01/25/2012 Location(s): Montana Offices(s): Western Area Power Administration-Rocky Mountain Region
Bucknam Temporary Tap, Natrona County, Wyoming CX(s) Applied: B4.6 Date: 12/15/2011 Location(s): Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region
Associated Electric Cooperative, Inc. Substation Improvements CX(s) Applied: B4.6 Date: 12/05/2011 Location(s): Missouri Offices(s): Southwestern Power Administration
Longview Sectionalizing Breaker Upgrades CX(s) Applied: B1.11, B4.6 Date: 11/28/2011 Location(s): Washington Offices(s): Bonneville Power Administration
Inland Power & Light 230-kilovolt Substation Project CX(s) Applied: B4.6 Date: 11/17/2011 Location(s): Washington Offices(s): Bonneville Power Administration
Blythe-Knob Guy Wire Anchor Replacement CX(s) Applied: B4.6 Date: 11/14/2011 Location(s): California Offices(s): Western Area Power Administration-Desert Southwest Region
Griffith Substation Transformer Addition CX(s) Applied: B4.6 Date: 11/14/2011 Location(s): Nevada Offices(s): Western Area Power Administration-Desert Southwest Region
Idalia to Asherville Transmission Line Reconductoring Project CX(s) Applied: B4.6 Date: 10/13/2011 Location(s): Missouri Offices(s): Southwestern Power Administration