Substation Maintenance and Renovation Activities CX(s) Applied: B1.3, B1.7, B1.11, B1.27, B1.31, B1.33, B2.2, B2.3, B2.5, B4.6 Date: 05/17/2013 Location(s): Colorado, Wyoming, Nebraska, Montana, Utah Offices(s): Western Area Power Administration-Rocky...
Parker Substation 161 Kilovolt 2013 Breaker Replacement CX(s) Applied: B4.6 Date: 05/17/2013 Location(s): California Offices(s): Western Area Power Administration-Desert Southwest Region
Chandler Tap Line Reconductoring CX(s) Applied: B4.6 Date: 05/17/2013 Location(s): Washington Offices(s): Bonneville Power Administration
Vernal Substation 138 Kilovolt Breaker Replacement CX(s) Applied: B4.6 Date: 05/08/2013 Location(s): Utah Offices(s): Western Area Power Administration-Rocky Mountain Region
Emergency Current Transformer Replacement at Gila Substation CX(s) Applied: B4.6 Date: 04/26/2013 Location(s): Arizona Offices(s): Western Area Power Administration-Desert Southwest Region
Animas River Substation Site Drainage Remediation CX(s) Applied: B4.6 Date: 04/26/2013 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region
Sundial Island Transmission Tower Relocation CX(s) Applied: B4.6 Date: 03/20/2013 Location(s): Oregon Offices(s): Bonneville Power Administration
Install Permanent Power for Saltstone Disposal Unit Construction CX(s) Applied: B4.6 Date: 03/06/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Rogue-Gold Beach No. 2 Disconnect Switch Replacement CX(s) Applied: B4.6 Date: 01/08/2013 Location(s): Oregon Offices(s): Bonneville Power Administration
Ault Substation Drainage Swale Construction CX(s) Applied: B4.6 Date: 12/13/2012 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region