Relay and Switchboard Panel Replacements CX(s) Applied: B4.6 Date: 10/29/2012 Location(s): Arkansas Offices(s): Southwestern Power Administration
Ross Transformer Oil Terminal Upgrade CX(s) Applied: B4.6 Date: 09/24/2012 Location(s): Washington Offices(s): Bonneville Power Administration
Willow Creek - Granby Tap 2.4 Kilovolt Distribution Line Structure 0/3A Pole Replacement Project CX(s) Applied: B4.6 Date: 09/20/2012 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region
Port Angeles Substation Equipment Additions CX(s) Applied: B4.6 Date: 09/14/2012 Location(s): Washington Offices(s): Bonneville Power Administration
Building 28-33 External Electrical Upgrades CX(s) Applied: B1.23, B2.5, B4.6, B4.13 Date: 08/24/2012 Location(s): Oregon Offices(s): National Energy Technology Laboratory
Building 22 Electrical Upgrades CX(s) Applied: B2.5, B4.6 Date: 08/20/2012 Location(s): Oregon Offices(s): National Energy Technology Laboratory
Building 29-31 Internal Electrical Upgrades CX(s) Applied: B2.1, B2.5, B4.6 Date: 08/20/2012 Location(s): Oregon Offices(s): National Energy Technology Laboratory
Optimization of Electrical Power at the Portsmouth Gaseous Diffusion Facility CX(s) Applied: B4.6, B4.11 Date: 08/09/2012 Location(s): Ohio Offices(s): Portsmouth Paducah Project Office
Pilot Butte-La Pine No. 1 Wood Pole Replacement Project CX(s) Applied: B4.6 Date: 07/30/2012 Location(s): Oregon Offices(s): Bonneville Power Administration
Line Switch Replacements at Guernsey Rural, Worland, Refinery, Box Butte, and Morrill Taps CX(s) Applied: B4.6, B4.11 Date: 07/30/2012 Location(s): Wyoming, Nebraska Offices(s): Western Area Power Administration-Rocky Mountain Region