FY13 Environmental Drainage Upgrades at Bonneville Power Administration’s Clatsop, Garrison, Lexington, Mapleton, Ovando, Pearl, and Wren Substations CX(s) Applied: B4.6 Date: 12/03/2012 Location(s): Oregon, Montana, Washington, Oregon, Oregon Offic...
Spring Creek – Wine County No. 1 Transmission Tower Relocation CX(s) Applied: B4.6 Date: 11/29/2012 Location(s): Oregon Offices(s): Bonneville Power Administration
Tucannon River Substation Expansion Project CX(s) Applied: B4.6 Date: 11/01/2012 Location(s): Washington Offices(s): Bonneville Power Administration
Relay and Switchboard Panel Replacements CX(s) Applied: B4.6 Date: 10/29/2012 Location(s): Arkansas Offices(s): Southwestern Power Administration
Ross Transformer Oil Terminal Upgrade CX(s) Applied: B4.6 Date: 09/24/2012 Location(s): Washington Offices(s): Bonneville Power Administration
Willow Creek - Granby Tap 2.4 Kilovolt Distribution Line Structure 0/3A Pole Replacement Project CX(s) Applied: B4.6 Date: 09/20/2012 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region
Port Angeles Substation Equipment Additions CX(s) Applied: B4.6 Date: 09/14/2012 Location(s): Washington Offices(s): Bonneville Power Administration
Building 28-33 External Electrical Upgrades CX(s) Applied: B1.23, B2.5, B4.6, B4.13 Date: 08/24/2012 Location(s): Oregon Offices(s): National Energy Technology Laboratory
Building 22 Electrical Upgrades CX(s) Applied: B2.5, B4.6 Date: 08/20/2012 Location(s): Oregon Offices(s): National Energy Technology Laboratory
Building 29-31 Internal Electrical Upgrades CX(s) Applied: B2.1, B2.5, B4.6 Date: 08/20/2012 Location(s): Oregon Offices(s): National Energy Technology Laboratory