Echo Lake Substation Isolation Disconnect Switch Installation CX(s) Applied: B4.6 Date: 09/30/2013 Location(s): Washington Offices(s): Bonneville Power Administration
Yaak Substation Transformer Replacement CX(s) Applied: B4.6 Date: 09/18/2013 Location(s): Montana Offices(s): Bonneville Power Administration
Adams Tap Motor-Operator Interrupters and Control Building Replacement CX(s) Applied: B4.6 Date: 09/11/2013 Location(s): Arizona Offices(s): Western Area Power Administration-Desert Southwest Region
Emergency Storm Damage Repairs to the Gila North Gila, Gila Knob, and Sonora San Luis Transmission Lines, near Yuma, Yuma County, Arizona CX(s) Applied: B4.6 Date: 08/26/2013 Location(s): Arizona Offices(s): Western Area Power Administration-Desert So...
Naselle Ridge Emergency Generator Replacement CX(s) Applied: B4.6 Date: 08/26/2013 Location(s): Washington Offices(s): Bonneville Power Administration
Transmission Line 3005, Structure 290 Replacement CX(s) Applied: B4.6 Date: 08/06/2013 Location(s): Oklahoma Offices(s): Southwestern Power Administration
Capacity Increase on Bonneville Power Administration's (BPA) Horse Ranch Tap Line CX(s) Applied: B4.6 Date: 07/17/2013 Location(s): Washington Offices(s): Bonneville Power Administration
McNary Substation Shunt Capacitor Addition CX(s) Applied: B4.6 Date: 07/17/2013 Location(s): Oregon Offices(s): Bonneville Power Administration
Insulator Replacement on Bonneville Power Administration's (BPA) North Bonneville-Midway No. 1 Transmission Line CX(s) Applied: B4.6 Date: 07/16/2013 Location(s): Washington Offices(s): Bonneville Power Administration
Hayden Substation 230-kilovolt Tie Line CX(s) Applied: B4.6 Date: 07/09/2013 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region