NERC Alert Phase III Transmission Line Structure Replacement Project CX(s) Applied: B4.6Date: 04/16/2015 Location(s): OklahomaOffices(s): Southwestern Power Administration
Sappho Substation Expansion CX(s) Applied: B4.6Date: 04/07/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
Burial of 13.8-kV Overhead Line in Burial Ground CX(s) Applied: B4.6Date: 03/31/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Contra Costa Soil Testing and Equipment Upgrades CX(s) Applied: B4.6, B4.11Date: 03/27/2015 Location(s): OtherOffices(s): Western Area Power Administration-Sierra Nevada Region
Snohomish-Murray Structure 7/6 Guywire Relocation CX(s) Applied: B4.6Date: 03/25/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
Casper PACE-Spence 230 Kilovolt Transmission Line Structure Replacement Project Matrona County, WY CX(s) Applied: B4.6Date: 03/19/2015 Location(s): WyomingOffices(s): Western Area Power Administration-Rocky Mountain Region
Olympia-St. Clair Emergency Impairment Remedy CX(s) Applied: B4.6Date: 03/16/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
Disconnect Switch Stand Grounding Upgrades - Spokane District CX(s) Applied: B4.6Date: 02/06/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
Burns Communication Site Upgrade CX(s) Applied: B4.6Date: 01/13/2015 Location(s): OregonOffices(s): Bonneville Power Administration
Gila-Gila Valley Lateral Transmission Line Rebuild CX(s) Applied: B4.6Date: 01/13/2015 Location(s): ArizonaOffices(s): Western Area Power Administration-Desert Southwest Region