Animas River Substation Site Drainage Remediation CX(s) Applied: B4.6 Date: 04/26/2013 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region
Sundial Island Transmission Tower Relocation CX(s) Applied: B4.6 Date: 03/20/2013 Location(s): Oregon Offices(s): Bonneville Power Administration
Install Permanent Power for Saltstone Disposal Unit Construction CX(s) Applied: B4.6 Date: 03/06/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Rogue-Gold Beach No. 2 Disconnect Switch Replacement CX(s) Applied: B4.6 Date: 01/08/2013 Location(s): Oregon Offices(s): Bonneville Power Administration
Ault Substation Drainage Swale Construction CX(s) Applied: B4.6 Date: 12/13/2012 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region
Holyoke Substation Transformer Replacement CX(s) Applied: B4.6 Date: 12/11/2012 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region
Lane Substation 500/230-kV Transformer Phase Separation Project CX(s) Applied: B4.6 Date: 12/06/2012 Location(s): Oregon Offices(s): Bonneville Power Administration
FY13 Environmental Drainage Upgrades at Bonneville Power Administration’s Clatsop, Garrison, Lexington, Mapleton, Ovando, Pearl, and Wren Substations CX(s) Applied: B4.6 Date: 12/03/2012 Location(s): Oregon, Montana, Washington, Oregon, Oregon Offic...
Spring Creek – Wine County No. 1 Transmission Tower Relocation CX(s) Applied: B4.6 Date: 11/29/2012 Location(s): Oregon Offices(s): Bonneville Power Administration
Tucannon River Substation Expansion Project CX(s) Applied: B4.6 Date: 11/01/2012 Location(s): Washington Offices(s): Bonneville Power Administration