Transmission Line 3005, Structure 290 Replacement CX(s) Applied: B4.6 Date: 08/06/2013 Location(s): Oklahoma Offices(s): Southwestern Power Administration
Capacity Increase on Bonneville Power Administration's (BPA) Horse Ranch Tap Line CX(s) Applied: B4.6 Date: 07/17/2013 Location(s): Washington Offices(s): Bonneville Power Administration
McNary Substation Shunt Capacitor Addition CX(s) Applied: B4.6 Date: 07/17/2013 Location(s): Oregon Offices(s): Bonneville Power Administration
Insulator Replacement on Bonneville Power Administration's (BPA) North Bonneville-Midway No. 1 Transmission Line CX(s) Applied: B4.6 Date: 07/16/2013 Location(s): Washington Offices(s): Bonneville Power Administration
Hayden Substation 230-kilovolt Tie Line CX(s) Applied: B4.6 Date: 07/09/2013 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region
Cottonwood-Roseville Optical Groundwire Project CX(s) Applied: B4.6, B4.7, B4.11, B4.13 Date: 07/03/2013 Location(s): California Offices(s): Western Area Power Administration-Sierra Nevada Region
Cheyenne Substation KV2A 115-kilovolt Tie Line Installation CX(s) Applied: B4.6 Date: 07/02/2013 Location(s): Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region
Removal and replacement of Oracle Breakers 562 and 762 along with associated disconnects. CX(s) Applied: B4.6 Date: 07/02/2013 Location(s): Arizona Offices(s): Western Area Power Administration-Desert Southwest Region
Nine Canyon Communication Tower Addition CX(s) Applied: B4.6 Date: 07/01/2013 Location(s): Washington Offices(s): Bonneville Power Administration
Hat Rock Switching Station Replacement Project CX(s) Applied: B4.6 Date: 06/17/2013 Location(s): Oregon Offices(s): Bonneville Power Administration