Replacement of the 254-13H Safety Significant Standby Diesel Generator CX(s) Applied: B2.5 Date: 03/03/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office
Routine Maintenance Activities CX(s) Applied: B1.3, B1.4, B1.5, B1.6, B1.7, B1.8, B1.11, B1.13, B1.15, B1.16, B1.17, B1.21, B1.22, B1.23, B1.27, B1.28, B1.31, B1.32, B2.1, B2.2, B2.3, B2.5 Date: 01/26/2014 Location(s): New Jersey Offices(s): Princeton...
MiniBooNE Berme Repair CX(s) Applied: B2.5 Date: 01/15/2014 Location(s): Illinois Offices(s): Fermi Site Office
Fabricate/Install Tank 42 Temporary Purge Ventilation Stack HEPA Filter HTF-TMC-13-033 CX(s) Applied: B2.5 Date: 12/09/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Mission Support Alliance Annual Categorical Exclusion for Facility Safety and Environmental Improvements under 10 CFR 1021, Subpart D, Appendix B, B2.5 for Calendar Year 2014 CX(s) Applied: B2.5 Date: 12/02/2013 Location(s): Washington Offices(s): Ri...
Infrastructure Upgrade to the Massachusetts Institute of Technology Research Reactor in Support of Operational Safety CX(s) Applied: B2.5 Date: 10/17/2013 Location(s): Idaho Offices(s): Idaho Operations Office
Nepese Marsh Upgrades CX(s) Applied: B2.5 Date: 10/17/2013 Location(s): Illinois Offices(s): Fermi Site Office
Construction and Maintenance Activities at Existing Field Offices and Operation Centers CX(s) Applied: B1.3, B1.4, B1.11, B1.16, B1.17, B1.27, B1.31, B1.33, B1.34, B2.2, B2.3, B2.5, B4.7, B5.1, B5.16, B5.17, B5.23 Date: 10/17/2013 Location(s): CX: non...
Safety, Health, and Environmental Improvements for FY2014 and FY2015 CX(s) Applied: B2.1, B2.2, B2.3, B2.5 Date: 09/26/2013 Location(s): Texas Offices(s): Pantex Site Office
B-922 Sprinkler System Replacement CX(s) Applied: B1.15, B2.2, B2.5 Date: 09/25/2013 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory