B-4 Rooms 110, 111, and 112 Roof Top Heating, Ventilation, and Air Conditioning Unit Replacement CX(s) Applied: B1.4, B2.1, B2.2, B2.5 Date: 04/16/2013 Location(s): West Virginia Offices(s): National Energy Technology Laboratory
Site Arc Flash Electrical Upgrades CX(s) Applied: B1.3, B2.5 Date: 04/16/2013 Location(s): Oregon Offices(s): National Energy Technology Laboratory
B903 Renovation CX(s) Applied: B1.16, B1.29, B2.1, B2.5 Date: 04/10/2013 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory
Alaska-TRIBE-ASSOCIATION OF VILLAGE COUNCIL PRESIDENTS, INC CX(s) Applied: B2.5, B5.1 Date: 04/11/2013 Location(s): Alaska Offices(s): Energy Efficiency and Renewable Energy
Easts Ide Renovation Project Zone 1-Revision (T-1-11) CX(s) Applied: B2.5, B5.2, B5.4, B5.5 Date: 03/13/2014 Location(s): Wyoming Offices(s): RMOTC
Easts Ide Renovation Project Zone 1-Revision (T-1-11) CX(s) Applied: B2.5, B5.2, B5.4, B5.5 Date: 03/13/2014 Location(s): Wyoming Offices(s): RMOTC
Correct Obstruction in the Sprinkler System on Level 3 of HB-Line CX(s) Applied: B2.5 Date: 03/11/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Permanent Power for MCU Sampling Building Heating, Ventilation and Air Conditioning and Ancillary CX(s) Applied: B2.5 Date: 03/07/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Southwestern Power Administration proposes to relocate one and add two additional transmission line structures to rectify safety and reliability co…
Installing Vent/Drain on Inlet Headers of 292-H Recycle Vessel Vent Fans CX(s) Applied: B2.5 Date: 01/28/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office