Easts Ide Renovation Project Zone 1-Revision (T-1-11) CX(s) Applied: B2.5, B5.2, B5.4, B5.5 Date: 03/13/2014 Location(s): Wyoming Offices(s): RMOTC
Easts Ide Renovation Project Zone 1-Revision (T-1-11) CX(s) Applied: B2.5, B5.2, B5.4, B5.5 Date: 03/13/2014 Location(s): Wyoming Offices(s): RMOTC
Correct Obstruction in the Sprinkler System on Level 3 of HB-Line CX(s) Applied: B2.5 Date: 03/11/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Permanent Power for MCU Sampling Building Heating, Ventilation and Air Conditioning and Ancillary CX(s) Applied: B2.5 Date: 03/07/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Southwestern Power Administration proposes to relocate one and add two additional transmission line structures to rectify safety and reliability co…
Installing Vent/Drain on Inlet Headers of 292-H Recycle Vessel Vent Fans CX(s) Applied: B2.5 Date: 01/28/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Stiffen Canyon Exhaust Fan 3 Motor Pedestal CX(s) Applied: B2.5 Date: 01/28/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Michigan-City-Macomb, Township of CX(s) Applied: A1, A9, A11, B2.5, B5.1 Date: 01/11/2013 Location(s): Michigan Offices(s): Energy Efficiency and Renewable Energy
Washington River Protection Solutions LLC - Facility Safety and Environmental Improvements CX(s) Applied: B2.5 Date: 12/14/2012 Location(s): Washington Offices(s): River Protection-Richland Operations Office
Cathodic Protection Potential Stations at 292-S Diesel Fuel Oil Storage Tanks CX(s) Applied: B2.5 Date: 12/11/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office