Morgantown Parking Garage Fire Alarm System CX(s) Applied: B1.3, B1.7, B2.5 Date: 08/08/2012 Location(s): West Virginia Offices(s): National Energy Technology Laboratory
Parking Garage Gutter Replacement and Installation of Roof Ice Melt System CX(s) Applied: B2.3, B2.5 Date: 08/01/2012 Location(s): West Virginia Offices(s): National Energy Technology Laboratory
Georgia-City-Columbus CX(s) Applied: A1, A9, A11, B1.32, B2.5, B5.1 Date: 08/01/2012 Location(s): Georgia Offices(s): Energy Efficiency and Renewable Energy
Safety Environmental Improvements 300 Area CX(s) Applied: B2.5 Date: 08/01/2012 Location(s): Washington Offices(s): River Protection-Richland Operations Office
Splicing of 480 VAC Cathodic Protection Power Cables CX(s) Applied: B2.5 Date: 07/26/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Tennessee-City-Chattanooga CX(s) Applied: A1, A9, A11, B2.5, B5.1 Date: 07/18/2012 Location(s): Tennessee Offices(s): Energy Efficiency and Renewable Energy
Colorado-County-Arapahoe CX(s) Applied: A1, A9, A11, B2.5, B5.1 Date: 07/18/2012 Location(s): Colorado Offices(s): Energy Efficiency and Renewable Energy
Buried Flow Line from 32-A-34 to 34-AX-34 CX(s) Applied: B2.5, B5.2, B5.4 Date: 07/17/2012 Location(s): Wyoming Offices(s): RMOTC
Building 1 Renovation CX(s) Applied: B1.15, B1.16, B2.1, B2.2, B2.5 Date: 07/16/2012 Location(s): West Virginia Offices(s): National Energy Technology Laboratory
Add Redundant Safety Significant Relief Valve to 773-2A CX(s) Applied: B2.5 Date: 07/16/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office