CX-024403: Electrical Transmission Line Pole Structure Relocation and Addition Project

Southwestern Power Administration proposes to relocate one and add two additional transmission line structures to rectify safety and reliability co…

Office of NEPA Policy and Compliance

February 14, 2013
Estimated Read Time   min

Southwestern Power Administration proposes to relocate one and add two additional transmission line structures to rectify safety and reliability concerns arising from a recent analysis indicating areas of low or sagging electrical transmission conductor lines.