Industrial Scale Demonstration of Smart Manufacturing Achieving Transformational Energy Productivity Gains CX(s) Applied: A9, B2.2, B2.5 Date: 08/15/2013 Location(s): Texas Offices(s): Golden Field Office
Building 4 Lead Paint Abatement & Repainting CX(s) Applied: B2.1, B2.5 Date: 08/13/2013 Location(s): Oregon Offices(s): National Energy Technology Laboratory
Install Stud, Shims, and Nut in the L-Basin 70-Ton Cask Lid Support Structure CX(s) Applied: B2.5 Date: 07/30/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Optimization Project #3 CX(s) Applied: B2.5, B5.2, B5.4, B5.5 Date: 07/26/2013 Location(s): Wyoming Offices(s): RMOTC
Optimization Project Area #1 CX(s) Applied: B2.5, B5.2, B5.4, B5.5 Date: 07/26/2013 Location(s): Wyoming Offices(s): RMOTC
Iona Relay Station Maintenance CX(s) Applied: B1.3, B1.11, B2.5 Date: 07/25/2013 Location(s): Idaho Offices(s): Nuclear Energy
B-19 Roof Replacement and Fall Arrest System Installation CX(s) Applied: B1.15, B2.5 Date: 07/25/2013 Location(s): West Virginia Offices(s): National Energy Technology Laboratory
B-40 Daycare Evacuation Sidewalks CX(s) Applied: B1.13, B2.5 Date: 07/25/2013 Location(s): West Virginia Offices(s): National Energy Technology Laboratory
Building 4 Ventilation Upgrades CX(s) Applied: B2.1, B2.5 Date: 07/17/2013 Location(s): Oregon Offices(s): National Energy Technology Laboratory
Pittsburgh Site Wide Exterior Door Repair/Replacement Project CX(s) Applied: B2.1, B2.5 Date: 07/17/2013 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory