Categorical Exclusion Determinations: B2.5

Building 3 Heating, Ventilation and Air Conditioning Improvements CX(s) Applied: B2.1, B2.5 Date: 08/29/2013 Location(s): West Virginia Offices(s): National Energy Technology Laboratory
Industrial Scale Demonstration of Smart Manufacturing Achieving Transformational Energy Productivity Gains CX(s) Applied: A9, B2.2, B2.5 Date: 08/15/2013 Location(s): Texas Offices(s): Golden Field Office
Install Stud, Shims, and Nut in the L-Basin 70-Ton Cask Lid Support Structure CX(s) Applied: B2.5 Date: 07/30/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
B-19 Roof Replacement and Fall Arrest System Installation CX(s) Applied: B1.15, B2.5 Date: 07/25/2013 Location(s): West Virginia Offices(s): National Energy Technology Laboratory