Install Elevated Fire Water Storage Tank CX(s) Applied: B2.5Date: 41862 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Radioactive Liquid Waste Treatment Facility (RLWTF) Tank Room Exhaust Duct CX(s) Applied: B2.5Date: 41864 Location(s): IdahoOffices(s): Nuclear Energy
Install Elevated Fire Water Storage Tank CX(s) Applied: B2.5Date: 41862 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Radiochemistry Laboratory (RCL) Supply Intake Filter Housing CX(s) Applied: B2.5Date: 41858 Location(s): IdahoOffices(s): Nuclear Energy
Materials and Fuels Complex (MFC) Fire Water Replacement and Upgrades CX(s) Applied: B2.5Date: 41849 Location(s): IdahoOffices(s): Nuclear Energy
Remote Closure Switch for Test Reactor Area (TRA)-786 Output Breaker CX(s) Applied: B2.5Date: 41827 Location(s): IdahoOffices(s): Nuclear Energy
PNNL Involving Facility, Safety, and Environmental Improvements in the 300 Area CX(s) Applied: B2.5 Date: 06/24/2014 Location(s): Washington Offices(s): River Protection-Richland Operations Office
Categorical Exclusion Determination
Zero Power Physics Reactor (ZPPR) Documented Safety Analysis (DSA) Implementation Project Tasks CX(s) Applied: B2.5 Date: 06/09/2014 Location(s): Idaho Offices(s): Nuclear Energy
Shelley-New Sweden Parking Lot Flood Control CX(s) Applied: B2.5 Date: 05/22/2014 Location(s): Idaho Offices(s): Nuclear Energy