Safety and Tritium Applied Research Standby Power Upgrade CX(s) Applied: B2.5Date: 07/17/2015 Location(s): IdahoOffices(s): Nuclear Energy
Naval Reactors Facility (NRF) Storm Sewer West Main Replacement Project CX(s) Applied: B2.5Date: 07/06/2015 Location(s): None ProvidedOffices(s): Naval Nuclear Propulsion Program
NWTC Bldg. 251 Roof & RTU-1 Replacement Project, NREL Tracking No. 15-007 Award Number: DE-AC36-08GO28308 CX(s) Applied: B1.16, B2.5, B1.14, B5.1, DOE/EA 1914 National Renewable Energy Laboratory (NREL) Date: 06/05/15 Location(s): CO Office(s):...
HB-Line Vessel Vent System (VVS) Valves; V-780 and V-784 CX(s) Applied: B2.5Date: 05/21/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
HB-Line Vessel Vent System (VVS) Valves; V-780 and V-784 CX(s) Applied: B2.5Date: 05/21/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Addition of Oil Catch Pans at Crane Control Room Shield Window CX(s) Applied: B2.5Date: 05/20/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Removal of Out of Service Equipment and Installation of high-efficiency particulate air Filter in Test Reactor Area 670 Pump Test Room CX(s) Applied: B2.5Date: 05/19/2015 Location(s): IdahoOffices(s): Idaho Operations Office
Categorical Exclusion Determination
Test Reactor Area-774 Substation Equipment Upgrades CX(s) Applied: B2.5Date: 04/27/2015 Location(s): IdahoOffices(s): Idaho Operations Office
Replacement of Test Reactor Area-671 Chemistry Monitoring Unit and Modification of Piping and Components CX(s) Applied: B2.5Date: 04/16/2015 Location(s): IdahoOffices(s): Idaho Operations Office