Hot Fuel Examination Facility Lab Hot Water System Modification CX(s) Applied: B2.5Date: 04/14/2015 Location(s): IdahoOffices(s): Idaho Operations Office
105-K Failed Tension Rod Disposition CX(s) Applied: B2.5Date: 03/31/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Install Automatic Condensate Valve on 108-1K Compressed Air System Receiving Tanks CX(s) Applied: B2.5Date: 03/31/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Replacement of Man Hole Covers Test Reactor Area Confined Space-051 and TRA-CX-091 CX(s) Applied: B2.5Date: 03/31/2015 Location(s): IdahoOffices(s): Idaho Operations Office
Provide a Rated Wall for HB-Line Stairwell #2, Storage Room and Fire Door CX(s) Applied: B2.5Date: 03/25/2015Location(s): South CarolinaOffices(s): Savannah River Operations Office
Idaho Falls (IF)-685 ERV-1 Work Platform CX(s) Applied: B2.5Date: 03/11/2015 Location(s): IdahoOffices(s): Nuclear Energy
Test Reactor Area (TRA)-774 Substation Equipment Upgrades CX(s) Applied: B2.5Date: 03/02/2015 Location(s): IdahoOffices(s): Nuclear Energy
Pump Station Improvements (Transcontinental) Award Number: DE-EE0006212 CX(s) Applied: B5.1, B2.5 State Energy Program Date: 02/18/2015 Location(s): LA Office(s): Golden Field Office
Pump Station Improvements (Terrytown #2) Award Number: DE-EE0006212 CX(s) Applied: B5.1, B2.5 State Energy Program Date: 02/18/2015 Location(s): LA Office(s): Golden Field Office
Pump Station Improvements, Helios Award Number: DE-EE0006212 CX(s) Applied: B5.1, B2.5 State Energy Program Date: 02/18/2015 Location(s): LA Office(s): Golden Field Office