Hot Fuels and Examination Facility (HFEF) Documented Safety Analysis (DSA) Implementation Tasks CX(s) Applied: B2.5 Date: 05/21/2014 Location(s): Idaho Offices(s): Nuclear Energy
Installation of a High Flux Thermal Neutron Source (HFTNS) CX(s) Applied: B2.5 Date: 05/21/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office
Arc Flash Hazard Mitigations - Morgantown CX(s) Applied: B1.15, B2.5 Date: 05/12/2014 Location(s): West Virginia Offices(s): National Energy Technology Laboratory
Remove HEPA Filters From The Old HB-Line Exhaust System CX(s) Applied: B2.5 Date: 05/08/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office
Tank 12 Temporary Blower Stack CX(s) Applied: B2.5 Date: 05/08/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office
Test Reactor Area (TRA)-640 Fire Sprinkler System Modifications CX(s) Applied: B2.5 Date: 05/01/2014 Location(s): Idaho Offices(s): Nuclear Energy
Removal of ignition sources, cable, and conduit in the 292-H Central Exhaust HEPA Room CX(s) Applied: B2.5 Date: 04/14/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office
Isolate Old 294-H Sand Filter CX(s) Applied: B2.5 Date: 04/14/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office
S8G Prototype Refueling Overhaul CX(s) Applied: B1.3, B1.5, B1.7, B1.14, B1.30, B1.31, B2.1, B2.4, B2.5, B6.3 Date: 04/01/2014 Location(s): New York Offices(s): Naval Nuclear Propulsion Program
Ductwork Modifications to Limit a Ground-Level Release CX(s) Applied: B2.5 Date: 03/05/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office