Re-Design Ballistic Resistance Enclosure (BRE) Overhead Hatch CX(s) Applied: B2.5Date: 08/14/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Office of NEPA Policy and Compliance
August 14, 2015Re-Design Ballistic Resistance Enclosure (BRE) Overhead Hatch
CX(s) Applied: B2.5
Date: 08/14/2015
Location(s): South Carolina
Offices(s): Savannah River Operations Office
The activity is to re-design and modify the BRE overhead hatches to effectively eliminate water leaking.