Categorical Exclusion Determination
Office of NEPA Policy and Compliance
November 14, 2015The purpose of the proposed action is to improve power system reliability at Central Facilities Area (CFA) building 1611 (CF-1611) in order to meet code requirements. The proposed project would reconfigure the electrical setup in the CF-1611 Fire Station so that there is some redundancy with the system. This work would separate essential and non-essential loads. This reconfiguration would include installation of new transformers, panels, receptacles, transfer switches, cable, conduit and wire.