Nepese Marsh Upgrades CX(s) Applied: B2.5 Date: 10/17/2013 Location(s): Illinois Offices(s): Fermi Site Office
Office of NEPA Policy and Compliance
October 17, 2013Nepese Marsh Upgrades
CX(s) Applied: B2.5
Date: 10/17/2013
Location(s): Illinois
Offices(s): Fermi Site Office
The proposed action would involve installation of approximately 50 feet of 18 inch culvert in the existing berm at the northwest corner of the marsh to accept water flow from the Village surface water drainage.
CX(s) Applied: B2.5
Date: 10/17/2013
Location(s): Illinois
Offices(s): Fermi Site Office
The proposed action would involve installation of approximately 50 feet of 18 inch culvert in the existing berm at the northwest corner of the marsh to accept water flow from the Village surface water drainage.