Install 4 115 KV capacitor banks, optical ground wire for communications, and SCADA for increased monitoring of grid components. …
The PA system is old and out of date. This DCF replaces some components of the system to update it.…
Replacement of 34 electric line protective and switching devices with SCADA-capable upgraded equipment.…
To purchase and install new equipment to make and test batteries and battery components.…
The Recipient shall upgrade and prepare the existing microgrid facility at the University of New Mexico (UNM) to accommodate cutting edge microgrid…
SMPA will issue an RFP to select an Energy Performance Contractor to complete the design, source the material and provide labor to install a 4.1 MW…
Bonneville Power Administration (BPA) proposes to replace aging substation equipment and to reconfigure and expand the substation yard at BPA’s Bri…
The Bonneville Power Administration (BPA) proposes to allow the Bureau of Land Management (BLM) to install an antenna on the existing BPA communica…
The scope of this project include replacing wooden electric poles with steel ones and then installing software to enhance the grid's resilience.…
This project is an in-place upgrade to existing protective devices and utility poles.…