Troy Power and Light plans to replace old electric meters with new smart meters, attaching repeaters to existing power poles to establish a network…
UMass Amherst plans to upgrade the campus's existing medium voltage electric distribution system through the installation of five Automatic Transfe…
The project scope includes replacing approximately five circuit miles of outdated copper powerline conductor with new aluminum conductor. This proj…
Installation of long duration battery energy storage system (LD-BESS), grid-forming inverter, charge controller, and all necessary electrical equip…
Construct 0.76 mi. of 3-phase line to connect two circuits. Install a 3000kVa transformer to connect two circuits. Convert 1.5 mi. of 1-phase lin…
Upgrading the SRS technological infrastructure by installing underground fiber optic cable at various locations across the site.…
BPA proposes to demolish an aging 12.5kV control house and replace a 48VDC control voltage breaker. The new breaker would work with the 130VDC batt…
BPA proposes to relocate a GPS antenna from a wooden utility pole to the south elevation of the Eugene Substation control house.…
The Bonneville Power Administration (BPA) proposes to install regional remedial action scheme (RAS) controllers inside the control house at BPA’s S…
Bonneville Power Administration (BPA) proposes to install a new 115-kilovolt (kV) power circuit breaker (PCB) and to complete additional equipment …