MTNT plans to add SCADA capabilities to the local powerplant. Specifically: Purchase a new OnLogic data storage computer as specified. Purchase 5 …
Fall River Rural Electric Cooperative plans to underground 3.22 miles of existing distribution lines in a heavily forested area in and next to Cari…
The City of Corwith plans a comprehensive grid resilience project that includes replacing approximately 158 wooden poles, 100 percent of crossarms,…
FEC plans to installation of a 1,000 kW/4,000 kWh containerized lithium-ion battery energy storage system (BESS) within the existing developed oper…
Hanford Mission Integration Solutions (HMIS) and their subcontractors perform removal of Polychlorinated Biphenyl (PCB)-containing items (including…
Hanford Mission Integration Solutions (HMIS) and their subcontractors perform acquisition, installation, operation, modification, and removal of el…
Bonneville Power Administration (BPA) to install a new BPA-owned Revenue and Power Quality (PQ) meter and associated equipment panels and racks wit…
The City of Tipton's Resiliency Project is a two-part project, where part 1 affects specific areas of the city, part 2 affects the entire city. Pro…
Bonneville Power Administration (BPA) proposes to install electronic equipment and fiber optic cable at Boardman and Morrow Flat substations, rebui…
Install the ADA technology at the Orsted Ford Ridge wind farm. The system will be designed to integrate with the plant's SCADA operational (OT) net…